Customization: | Available |
---|---|
After-sales Service: | Guarantee After-Sales Service |
Material: | GRP |
Still deciding? Get samples of US$ 1.5/Meter
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The AT195 GRP Roofing Internal Right Angle trim is used when forming internal corners on features such as steps, walls and upstands (inc roof lanterns), it can be used horizontally or vertically.
If you need to form an External corner, please use the AT195 Ext.
Length | 3 meters |
Girth | 195mm |
Flange widths | 85mm&105mm |
Upstand Height | 120mm |
AT195 Int/Ext
The AT195 Internal and External trim is used wherever the laminate needs to cover an area which continues perpendicular to another laminated surface. The AT195 Ext is supplied with a high-adhesion finish on its outer fascia and should be used for capping applications. The AT195 Int trim is supplied with a high adhesion finish on its outer fascia and should be used for internal corners. The trim should be nailed at both edges if possible. Always bandage over the join between where the nails penetrate the trim and the decking before applying the laminate. These trims are supplied in 3 metre lengths as standard.Q&A for GRP Roof Trim Installation: Learn More about GRP Roof trims
Q1: How do I fit GRP trims during a fibreglass roofing installation?
A: Fitting fibreglass trims is a crucial step in completing a roofing project. Start by cutting the trims to size and use a suitable polyurethane adhesive (PU) for a strong bond. Carefully glue and secure the trims to prevent leaks and gaps.
Q2: What's the quick guide for fitting GRP trims?
A: Apply PU adhesive to the perimeter batten, ensuring a 30mm bead at 300mm intervals. Secure trims with nails or staples, maintaining a consistent 30mm PU bead. Join trims by nailing or stapling, starting at each end and progressing at 200mm intervals.
Q3: How do I install A170/A200/A250 Drip Trims?
A: Apply PU adhesive to the batten, allowing space for the gutter. Nail the trim to the decking without nailing through the front. A planning machine can be used to ensure a flush fit on minimal-pitch roofs.
Q4: What's the process for B230/B260/B300 Raised Edge Trims?
A: Fix a single batten level with the deck, apply 30mm PU beads every 300mm, and secure the trim with nails. Reinforce the trim for ladder use, either by doubling up or adding an extra layer of GRP laminate.
Q5: How to fit C100 Simulated Lead Flashing?
A: Fit into a bed joint or a deep chase cut, apply PU adhesive every 300mm, press the trim firmly back to overlap with D trim, and seal with clear silicone. C100 features a 100mm vertical face and 35mm wall penetration.