• GRP B260 Raised Edge Trim
  • GRP B260 Raised Edge Trim
  • GRP B260 Raised Edge Trim
  • GRP B260 Raised Edge Trim
  • GRP B260 Raised Edge Trim
  • GRP B260 Raised Edge Trim

GRP B260 Raised Edge Trim

After-sales Service: Guarantee After-Sales Service
Material: GRP
Usage: Roof
Samples:
US$ 1.5/Meter 1 Meter(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
GRP B260 Raised Edge Trim pictures & photos
GRP B260 Raised Edge Trim
US $1.4 / Meter
Min. Order: 1,000 Meters
Manufacturer/Factory, Trading Company
Gold Member Since 2017

Suppliers with verified business licenses

Secured Trading Service
Hebei, China
to see all verified strength labels (14)
  • Overview
  • Product Description
  • Detailed Photos
  • Main Features
  • Application
  • Package
  • FAQ
Overview

Basic Info.

Model NO.
b260
Customized
Customized
Color
Customized
Length
Customized
Thickness
Customized
H.S Code
3921909090
Transport Package
Iron Frame
Specification
b260
Trademark
Taiwen
Origin
China
HS Code
3921909090

Packaging & Delivery

Package Size
100.00cm * 20.00cm * 20.00cm
Package Gross Weight
2.000kg

Product Description


 
Product Description

The Easy To Use Edge Trim


All of our GRP roof edge trims feature a unique high-adhesion finish that gives an excellent bond to most liquid applied and single-ply systems (tested with both rigid and flexible polyester, polyurethane, acrylic and alkyd systems.) Suitable for flat roofing, cladding, domestic and industrial applications.

B260 GRP Raised Roofing Edge Trim

B260 GRP Raised Roofing Edge Trim is a Flat roof edge detail to prevent water run off, depth matches A200 drip trim.

3 Metre Length - Girth 260mm - Depth 130mm (inc raised element)  - depth 90 mm 

Compatible with A200 drip trim and C1, C2 and C3 corner trims

     
    Detailed Photos

    GRP B260 Raised Edge Trim


     
    Main Features

     

    • Pre formed GRP Roofing Edge trim
    • Designed to be easy to use and fit
    • Compatible with our range of Roofing Trims and Resins
    • Can be easily cut to any required length
    • Forms a neat finish to the roof edge
    • Topcoat in any colour
     
    Application

     

    Typical Cold Roof 
    GRP B260 Raised Edge Trim
    1. B260 edge trim. 2. D260 edge trim
    3. C100 edge trim 4. A200 edge trim
    5. C1 universal external corner 6. 18mm OSB3 decking
    7. 450g/m2 Chopped Strand Mat 8. GRP laminate( roofing resin reinforced by CSM)
    9. Topcoat  
     

    Warm Roofs and Edge Trim Application

    Warm Roof Application

    A GRP roof can be easily configured in either a warm or cold roof specification. For a warm roof, a sub-deck is first fixed to the joists at 300mm centres. A vapour check and insulation sheet is then laid over the top. Insulation sheets can also be purchased with a vapour check adhered to one side. The decking should then be fixed on top as it normally would be, screws should be used to fix the boards to the joists and these should penetrate through the insulation and into the joists to the same depth as standard fixings. It is imperative that all layers of the roof are pressed firmly together and that there are no gaps between any of the layers. The GRP should then be laminated over the top of the roof as normal. These roofs will usually require larger edge trim sizes such as A250 and B300.

    B230/B260/B300- Raised Edge Trim

    A single batten is fixed level with the top edge of the deck. Apply 30mm beads of PU adhesive to the batten every 300mm, rub the trim into place and nail through the top of the trim into the decking. Do not nail through the front of the trim. If a ladder is likely to be leant against a B type trim for regular access to the roof, the trim will need to be reinforced to avoid deformation. The trim can either be doubled up by slotting a section of extra trim within the section where the ladder will be used or it can be reinforced with an extra layer of GRP laminate and then tissue to maintain a smooth finish. Alternatively, a wooden batten can be shaped and fitted into the ridge of the trim to ensure that it remains rigid.

    TRIM DETAILS: B230: The smallest size of raised edge trim fitted to the edges of the roof to contain and direct the flow of water. B260: The standard size raised edge trim. B300: Larger raised edge trim for use on warm roofs.



     

    Cross-Section of B Trim Application

     

    GRP B260 Raised Edge Trim

    Application Notes
    GRP flat roof trims can be used to adapt most flat roofing systems to almost any application.
    Where two lengths of edge trim need to be joined, a strip of polyurethane (PU) adhesive should be applied along the inside of the overlapping trim.
    When constructing a flat roof it is recommended to build a fall into the roof to aid drainage.
    Trim fascias may be painted at a later date using any suitable gloss or masonry paint.
    If used with a GRP roofing system, GRP edge trims can be laminated over their entire surface area if required or can be finished with topcoat applied directly to the surface of the trim. 
     
    Package

     

    GRP B260 Raised Edge Trim
    FAQ

    Q&A for GRP Roof Trim Installation: Learn More about GRP Roof trims 

    Q1: How do I fit GRP trims during a fibreglass roofing installation?
    A: Fitting fibreglass trims is a crucial step in completing a roofing project. Start by cutting the trims to size and use a suitable polyurethane adhesive (PU) for a strong bond. Carefully glue and secure the trims to prevent leaks and gaps.

    Q2: What's the quick guide for fitting GRP trims?
    A: Apply PU adhesive to the perimeter batten, ensuring a 30mm bead at 300mm intervals. Secure trims with nails or staples, maintaining a consistent 30mm PU bead. Join trims by nailing or stapling, starting at each end and progressing at 200mm intervals.

    Q3: How do I install A170/A200/A250 Drip Trims?
    A: Apply PU adhesive to the batten, allowing space for the gutter. Nail the trim to the decking without nailing through the front. A planning machine can be used to ensure a flush fit on minimal-pitch roofs.

    Q4: What's the process for B230/B260/B300 Raised Edge Trims?
    A: Fix a single batten level with the deck, apply 30mm PU beads every 300mm, and secure the trim with nails. Reinforce the trim for ladder use, either by doubling up or adding an extra layer of GRP laminate.

    Q5: How to fit C100 Simulated Lead Flashing?
    A: Fit into a bed joint or a deep chase cut, apply PU adhesive every 300mm, press the trim firmly back to overlap with D trim, and seal with clear silicone. C100 features a 100mm vertical face and 35mm wall penetration.





     

    Send your message to this supplier

    *From:
    *To:
    *Message:

    Enter between 20 to 4,000 characters.

    This is not what you are looking for? Post a Sourcing Request Now

    You Might Also Like

    From payment to delivery, we protect your trading.
    GRP B260 Raised Edge Trim pictures & photos
    GRP B260 Raised Edge Trim
    US $1.4 / Meter
    Min. Order: 1,000 Meters
    Gold Member Since 2017

    Suppliers with verified business licenses

    Secured Trading Service
    Manufacturer/Factory, Trading Company
    Management System Certification
    ISO 9001, HSE