Customization: | Available |
---|---|
After-sales Service: | Guarantee After-Sales Service |
Material: | GRP |
Still deciding? Get samples of US$ 1.5/Meter
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
E280 GRP Roofing Expansion Trim
Our preferred trim for creating an expansion joint in a fibreglass roof. Also used as a decorative trim on the ridge of a pitched GRP roof. 3 metre length.
This trim is utilised when your roof exceeds 45m2, to aid expansion properties in higher temperatures - It is installed over a gap in the board decking.
3 metre length 200mm width - 50mm height - Flanges 90mm
Typical Cold Roof
1. B260 edge trim. | 2. D260 edge trim |
3. C100 edge trim | 4. A200 edge trim |
5. C1 universal external corner | 6. 18mm OSB3 decking |
7. 450g/m2 Chopped Strand Mat | 8. GRP laminate( roofing resin reinforced by CSM) |
9. Topcoat |
Cross-Section of G and E Trim Application (E280 applied in same way.)
Q&A for GRP Roof Trim Installation: Learn More about GRP Roof trims
Q1: How do I fit GRP trims during a fibreglass roofing installation?
A: Fitting fibreglass trims is a crucial step in completing a roofing project. Start by cutting the trims to size and use a suitable polyurethane adhesive (PU) for a strong bond. Carefully glue and secure the trims to prevent leaks and gaps.
Q2: What's the quick guide for fitting GRP trims?
A: Apply PU adhesive to the perimeter batten, ensuring a 30mm bead at 300mm intervals. Secure trims with nails or staples, maintaining a consistent 30mm PU bead. Join trims by nailing or stapling, starting at each end and progressing at 200mm intervals.
Q3: How do I install A170/A200/A250 Drip Trims?
A: Apply PU adhesive to the batten, allowing space for the gutter. Nail the trim to the decking without nailing through the front. A planning machine can be used to ensure a flush fit on minimal-pitch roofs.
Q4: What's the process for B230/B260/B300 Raised Edge Trims?
A: Fix a single batten level with the deck, apply 30mm PU beads every 300mm, and secure the trim with nails. Reinforce the trim for ladder use, either by doubling up or adding an extra layer of GRP laminate.
Q5: How to fit C100 Simulated Lead Flashing?
A: Fit into a bed joint or a deep chase cut, apply PU adhesive every 300mm, press the trim firmly back to overlap with D trim, and seal with clear silicone. C100 features a 100mm vertical face and 35mm wall penetration.